Bonding and sealing for the gap of joints of road, airport runway, square, wall pipe, wharf, roof, underground garage and basement.
Sealing for leakage of oil refinery and chemical plant.
Bonding and sealing for industrial floor, such as epoxy floor and all kinds of paint surface.
Excellent bonding, sealing and repairing of various kinds of materials, such as concrete building, wood, metal, PVC, ceramics, carbon fiber, glass, etc.
All product properties and application details based on information are ensured to be reliable and accurate. But you still need to test its property and safety before application.
All advices we supply can’t be applied in any circumstances.
CHEMPU don't make assurance of any other applications outside the specification until CHEMPU supply a special written guarantee.
CHEMPU is only responsible to replace or refund if this product is defective within the warranty period stated above.
CHEMPU makes it clear that will not take responsible for any accidents.
PROPERTY SL-100 |
|
Appearance |
Grey Uniform Sticky Liquid |
Density (g/cm³) |
1.35±0.1 |
Tack Free Time (Hr) |
2.5 |
Adhesion Elongation |
666 |
Hardness (Shore A) |
20 |
Resilience Rate (%) |
118 |
Curing Speed (mm/24h) |
3 ~ 5 |
Elongation at Break (%) |
≥1000 |
Solid Content (%) |
99.5 |
Operation Temperature ( ℃) |
5-35 ℃ |
Service Temperature ( ℃) |
-40~+80 ℃ |
Shelf Life (Month) |
9 |
Implementation of standards: JT/T589-2004 |
StorageNotice
1.Sealed and stored in cool and dry place.
2.It is suggested to be stored at 5~25 ℃, and the humidity is less than 50%RH.
3.If the temperature is higher than 40 ℃ or the humidity is more than 80%RH, the shelf life may be shorter.
Packing
500ml/Bag, 600ml/Sausage, 20kg/Pail 230kg/Drum
Application
Operation
Cleaning The substrate surface must be solid, dry and be clean. Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning,
blowing, and so on.
Operation: Put the sealant into the operating tool, then injecting it into the gap.
Reservation Gap: The construction joint will expand as the temperature change,so the surface of the sealant should be lower than 2mm of the pavement after construction.
Cleaning: The substrate surface must be solid, dry and be clean. Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning, blowing, and so on.
Operation: Put the sealant into the operating tool, then injecting it into the gap.
Reservation Gap: The construction joint will expand as the temperature change,so the surface of the sealant should be lower than 2mm of the pavement after construction.
Operation Methods: Because the packing is different, the construction methods and tools are slightly different. The specific construction method can be checked in by www.joy-free.com
Attention of operation
Wear suitable protective clothing, gloves and eye/face Protection. After contact with skin, wash immediately with plenty of water and soap. In case of accident or if you feel unwell, seek medical advice immediately